Tool Hook Up and process pipework installation
Merit were awarded all basebuild and tool hook up mechanical works at International Rectifier, Newport. Works were carried out in both 6" and 8" Fabs and Merit also provided Proje ... ... more

LCN (London Centre Nanotechnology)
Special Gas & Gas Detection Installation
At the university college London, Merit were contracted to provide the installation of the special gas systems for the new London Centre for Nanotechnology. The scope of works included the deliv ... ... more

University of Newcastle upon Tyne (Bedson Building)
Chemistry Laboratory Refurbishment
Following the successful conclusion of the Nanotechnology and bio Medical Laboratory expansion project, the University of Newcastle upon Tyne awarded Merit further contracts for the refurbishment of e ... ... more

NaREC (new and renewable energy centre)
Turnkey design and build
The new and renewable energy centre (NaREC) in Blyth, Northumberland, is a government funded clean room facility for solar cell R&D The scope of works was the refurbishment of an existing buildin ... ... more

D+B Laboratory fit-out project
Location: Egham - Local to heathrow airport Project Scope: Significant demolition works, Building extension, M+E services installation and laboratory fit ... ... more

D+B Laboratory fit-out project
Location: Prudhoe, Northumberland Project Scope:  ... ... more

M+E Services and Pre-fab for Halley VI
Halley VI - the first new UK Antarctic research station in 20 years. Merit has been selected (by Morrison and BAS) as preferred contractor for outline design and Mech, Elect & HVAC services. ... ... more

Beamline Laboratories - Turnkey Installations
Merit were awarded, as two separate contracts, the turnkey Design and Installation of the cabins and services for Beamlines I06, I15, I16 and I22. The scope includes; Design and Space plannin ... ... more

Machine Process Pipe Work Installation
The machine pipe work contract involves the installation of the stainless steelTru-Bore system from the basebuild services to the machine connections. The De-min water systems are used for the coolin ... ... more

Installation of Machine
The manpower contract involves Merit providing the staffing of all trades for the construction and installation of the accelerator, currently numbering 64 personnel. Disciplines include; ... ... more

Base Build Pipe Work Installation
Diamond Light Source is £250m synchrotron construction project at the RAL (Rutherford Appleton Laboratory) at Harwell, Didcot. The Merit basebuild contract includes 15,000m of orbitally welde ... ... more

Novartis (formerly Chiron Vaccines)
Site 4 - Cleanroom Construction-flu Vaccine Facility
Novartis Site 4 is the new Flu Vaccine facility under construction at Speke, Liverpool. Merit are currently performing the detailed design and construction for over 9,000m2 of FDA validated clean roo ... ... more

Novartis (formerly Chiron Vaccines)
Site 2 - Grade A to D Cleanroom Suite
A project for Chiron Vaccines, Speke, where Merit were contracted to provide the construction of a validated Grade A to D Live Virus Freeze Drier GMP Cleanroom suite has recently been completed. The ... ... more

BioReliance - Invitrogen Bioservices
Upgrade of Cleanroom Suites
For BioReliance in Scotland, Merit self-perfomed the turnkey cleanroom construction and HVAC upgrade of Grade B GMP cleanroom suites. Contract Value was GBP 350k. ... ... more

Tool Hook Up & Process Pipework Installation
Merit have a longstanding association with the former Siemens 8" Wafer Fab which was restarted by Atmel in 2000. From 1996 to 1998, Merit installed GBP 2m of high purity chemical and solvent dist ... ... more

Compressed Air System Installation
Altana Pharma AG have invested 70mEuro in Cork, Ireland, in the construction of a new pharmaceutical production facility. Imtech, one of the main contractors on site, awarded the contract to instal ... ... more

University of Newcastle upon Tyne
Phase 1 - Turnkey Design & Build
During May of 2003, Merit were awarded the contract for the Design/Build of the new Nanotechnology Fabrication Facility. The project was fast track, with only a sixteen week programme until the c ... ... more

Phase 1 - Turnkey Design & Build
One the first contracts Merit Merrell secured was for Domnick Hunter Filtration Ltd., at the Birtley site location. The complete scope of works for Domnick Hunter (Phase 1) included: Construc ... ... more